MIL-DTL-53078A
IPC ASSOCIATION CONNECTION ELECTRONICS INDUSTRIES
IPC J-STD-001
-
Requirements for Soldered Electrical and Electronic
Assemblies
(Copies of these documents are available from www.ipc.org or IPC Association Connecting
Electronics Industries, 3000 Lakeside Drive, 309 S, Bannockburn, IL 60015)
2.4 Order of precedence. In the event of a conflict between the text of this document and
the references cited herein, the text of this document takes precedence. Nothing in this
document, however, supersedes applicable laws and regulations unless a specific exemption has
been obtained.
3. REQUIREMENTS
3.1 General description. The M1 CLAMS mounting kit provides the interface between
the CLAMS and the M1 series tank. The mounting kit shall consist of the following items: a
structural adapter for mounting the CLAMS dispenser box at the rear of the vehicle, metallic heat
insulation panels that will encase the CLAMS dispenser box and protect its contents from high
temperature engine exhaust, a converter box to provide electrical interface between the vehicle
and CLAMS control box which controls marker dispensation, and interconnecting electrical
harnesses.
3.2 Drawings. The drawings forming a part of this specification are end product
drawings. No deviations from the prescribed dimensions or tolerances are permissible without
prior approval of the contracting officer. Where tolerances could cumulatively result in incorrect
fits, the contractor shall provide tolerances within those prescribed on the drawings to ensure
correct fit, assembly, and operation of the kit. Any data (e.g., shop drawings, layouts, flow
sheets, processing procedures, etc.) prepared by the contractor or obtained from a vendor to
support fabrication and manufacture of the production item shall be made available, upon
request, for inspection by the procuring activity or his designated representative (see 6.2).
3.3 First article (first produced kit). Unless otherwise specified (see 6.2), one or more
samples shall be subjected to first article inspection (see 4.3 and 6.3) to prove that his production
methods will produce kits that comply with the requirements of this specification. Any changes
or deviations of mounting kits from the approved first article during production will be subject to
the approval of the contracting officer. Approval of the first article will not relieve the contractor
of his obligation to furnish mounting kits conforming to this specification.
3.4 Performance characteristics.
3.4.1 Converter box.
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business