MIL-DTL-46789D(AT)
TABLE II. Classification of inspections.
First article
CI
Title
Requirement
Inspection
Prepro-
Initial
Exam
Test
duction production
(100%)
Group A:
Materials, design &
3.2, 3.2.1,
4.5
X
X
construction
3.2.2, 3.2.3,
3.3
Finish
3.2.4
4.5.1
X
X
X
Operational
requirements
Electrical output
3.4.1
4.6.1
X
X
Electrical output
4.6.1.1
X
(100%) inspection
Operation position
3.4.2
4.6.2
X
X
Dielectric strength
3.4.3
4.6.3
X
X
Insulation resistance
3.4.4
4.6.4
X
X
Rotation
3.4.5
4.6.5
X
X
Torque & operational
3.4.6 & 3.4.7
4.6.5.1
X
X
Stability
3.5
4.7
X
Interface requirements
3.6
4.8
Support and ownership
requirements
Safety
3.6.1
4.8.1
X
X
X
Identification marking
3.6.2
4.8.2
X
X
X
3.7
4.9
Operating environment
requirements
Waterproofness
3.7.1
4.9.1
X
X
Sand & dust proof
3.7.2
4.9.2
X
X
Fungus resistance
3.7.3
4.9.3
X
Shock resistance
3.7.4
4.9.4
X
X
Corrosion resistance
3.7.5
4.9.5
X
X
Vibration
3.7.6
4.9.6
X
X
High temperature
3.7.7
4.9.7
X
X
Low temperature
3.7.7
4.9.8
X
X
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business