MIL-DTL-46789D(AT)
TABLE III. First article test sequence. 1/
Preproduction
Initial production
Title
Requirement
Test
sample
sample
1
2
1
2
Design & construction
3.3
4.5
X
X
X
X
Operating requirements
3.4
4.6
X
X
X
X
Electrical output
3.4.1
4.6.1
X
X
X
X
Physical characteristics
3.4.5, 3.5
4.6.5, 4.7
X
X
X
X
Waterproofness
3.7.1
4.9.1
X
X
X
X
Sand & dust proof
3.7.2
4.9.2
X
X
Fungus resistance
3.7.3
4.9.3
X
Shock resistance
3.7.4
4.9.4
X
X
X
X
Corrosion resistance
3.7.5
4.9.5
X
X
Vibration resistance
3.7.6
4.9.6
X
X
X
X
High temperature
3.7.7
4.9.7
X
X
X
X
Low temperature
3.7.7
4.9.8
X
X
X
X
1/ Perform tests in the order listed.
4.4 Test fixture. When specified herein, the blasting machine assembly shall be mounted
in a test fixture as illustrated in figure 1.
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business