MIL-PRF-46720C
TABLE I. Verification methods.
Title
Requirements
Verification
Sample No.
Materials & dissimilar metals,
3.2, 3.4.1 thru
4.3, 4.3.4.1
overall envelope & interfaces,
3.4.9, 3.5.2
thru 4.3.4.4,
weight, solenoid, coils, safety,
thru 3.5.4
4.3.5.2, 4.3.5.3,
1 thru 4
interchangeability &
& 4.3.5.4
identification
Operating time
3.3.1
4.3.3.1
Operating pressure
3.3.2
4.3.3.2
Operating voltage
3.3.3
4.3.3.3
Operating current
3.3.4
4.3.3.3
Rated flow and pressure drop
3.3.5
4.3.3.4
1
Solenoid temperature rise
3.3.9
4.3.3.8
Electromagnetic compatibility
3.4.5
4.3.4.5
Dielectric strength
3.3.10
4.3.3.9
Burst pressure
3.3.7
4.3.3.6
Endurance
3.5.1
4.3.5.1
Operating pressure
3.3.2
4.3.3.2
Operating voltage
3.3.3
4.3.3.3
2
Operating current
3.3.4
4.3.3.3
Rated flow and pressure drop
3.3.5
4.3.3.4
Proof pressure
3.3.6
4.3.3.5
Leakage
3.3.8
4.3.3.7
High temperature
3.6.1
4.3.6.1
Operating pressure
3.3.2
4.3.3.2
Rated flow and pressure drop
3.3.5
4.3.3.4
Proof pressure
3.3.6
4.3.3.5
Low temperature
3.6.2
4.3.6.2
Operating pressure
3.3.2
4.3.3.2
Rated flow and pressure drop
3.3.5
4.3.3.4
Proof pressure
3.3.6
4.3.3.5
3
Sand and dust
3.6.5
4.3.6.5
Operating pressure
3.3.2
4.3.3.2
Rated flow and pressure drop
3.3.5
4.3.3.4
Proof pressure
3.3.6
4.3.3.5
Fungus
3.6.3
4.3.6.3
Operating pressure
3.3.2
4.3.3.2
Rated flow and pressure drop
3.3.5
4.3.3.4
Proof pressure
3.3.6
4.3.3.5
Shock
3.6.6
4.3.6.6
Operating pressure
3.3.2
4.3.3.2
Rated flow and pressure drop
3.3.5
4.3.3.4
4
Proof pressure
3.3.6
4.3.3.5
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business