MIL-DTL-53077A
6.6 Government-furnished property. The contracting officer should arrange to furnish
the property listed in 3.18.
6.7 Changes from previous issue. The margins of this specification are marked with
vertical lines to indicate where changes from the previous issue were made. This was done as a
convenience only and the Government assumes no liability whatsoever for any inaccuracies in
these notations. Bidders and contractors are cautioned to evaluate the requirements of this
document based on the entire content irrespective of the marginal notations and relationship to
the last previous issue.
6.8 Subject term (key word) listing.
Abrams
Hydraulic quick disconnect
Integrated brackets
M1RMK
M60 retrofit
One piece weldment
Custodian:
Preparing Activity:
Army AT
Army - AT
(Project 2590-2011-002)
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency
of the information above using the ASSIST Online database at https://assist.daps.dla.mil.
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business